W.W. GRAINGER INC.
WARWICK, RI
Exterior and interior renovations to existing facility.
Responsibility: General Contractor
Owner: W.W. Grainger Inc.
Architect: The RGB Corporation
ROSE HILL TRANSFER STATION
SOUTH KINGSTON, RI
Construction of a pre-engineered metal building to be used as a new solid waste refuge station for the town of South Kingston.
Responsibility: General Contractor
Owner/ Developer: Town of South Kingston
Architect: Pare Engineers
BURLINGAME STATE PARK
CHARLESTOWN, RI
Provided complete construction services for a pre-engineered metal maintenance garage building and contemporary, free standing bathing facilities with new individual service disposal systems.
Responsibility: General Contractor
Owner: Department of Environmental Management
Architect: Robert Haig Associates
CHINESE PRODUCTS CORPORATION
WARWICK, RI
Emergency stabilization and reconstruction of a storage warehouse facility. Damaged by snow and wind overload.
Responsibility: General Contractor
Owner: Chinese Products Corporation
Engineer: In-House
CHINESE PRODUCTS CORPORATION
WARWICK, RI
Addition to storage warehouse facility.
Responsibility: Design/Builder
Owner: Chinese Products Corporation
Engineer: George J. Geisser, III
CRANSTON COMMUNITY ACTION PROGRAM
CRANSTON, RI
Interior renovations to existing bathrooms, entrance and the installation of a wheel chair lift so that the building will conform to the Americans With Disabilities Act requirements.
Responsibility: General Contractor
Owner: Cranston Community Action Program
Architect: Arch Design
PAUL ARPIN VAN LINES
WEST WARWICK, RI
Interior renovations and improvements to the existing warehouse mezzanine to create additional office/storage space.
Responsibility: Design/Builder
Owner: Paul Arpin Van Lines Inc.
Architect: Arch Design
BRAILEY BEAUTY SUPPLY
WARWICK, RI
Renovate an existing masonry warehouse to create an office an showroom space for beauty supplies distributor.
Responsibility: Design/Builder
Owner: Brailey Beauty Supply
Architect: In-House |